The project will evaluate prospecting in lunar orbit and on the surface.
The study will consider mining and construction capabilities as well as in-situ processing of resources.
The project is funded by Canadian Space Agency.
Project info
BTH project leader: Professor Tobias Larsson
Time span: 2022-2023
Funding: $248,000 (Canadian Space Agency)
Partners:
Related links
- The Canadian Space Agency funds novel ideas for potential Moon infrastructure (2022-06-03)
- A Concept Design to Enable Lunar Mining (MSc thesis 2022)
- BTH project site: https://www.productdevelopment.se/?p=13408